What actually slows down a project?
What actually slows down a project?
I the past (and, almost certainly, the future), I spoke derisively about users who try way too hard to minimize mouse-clicks and feature count. While these things measure CAD gamesmanship, these things are never what accelerates a project.
CAD acumen is not tested by what you can make, but what you can change. Can your CAD models stand up to the twists and turns of unforeseen changes that inevitably crop up on the path from drunken marketing feverdream to final delivery?
CAD acumen is not tested by what you can make, but what you can change. Can your CAD models stand up to the twists and turns of unforeseen changes that inevitably crop up on the path from drunken marketing feverdream to final delivery?
Re: What actually slows down a project?
What you speak of becomes so much more important when all files are part of the "Standard Parts Library" and have an unknown scope.HerrTick wrote: ↑Mon Feb 07, 2022 2:19 pm I the past (and, almost certainly, the future), I spoke derisively about users who try way too hard to minimize mouse-clicks and feature count. While these things measure CAD gamesmanship, these things are never what accelerates a project.
CAD acumen is not tested by what you can make, but what you can change. Can your CAD models stand up to the twists and turns of unforeseen changes that inevitably crop up on the path from drunken marketing feverdream to final delivery?
Re: What actually slows down a project?
For me, the big slow downs have been in order from biggest to smaller:
- Lost references
- waiting for decisions about the product or process
- getting clarifications on technical details
- Lost references
- waiting for decisions about the product or process
- getting clarifications on technical details
Blog: http://dezignstuff.com
- jcapriotti
- Posts: 1869
- Joined: Wed Mar 10, 2021 6:39 pm
- Location: The south
- x 1214
- x 1999
Re: What actually slows down a project?
In my experience:
- Setting unrealistic deadlines without input from those doing the work.
- Ignoring those users when they do ask.
- Undoing those decisions once they realize it isn't going to work.
Jason
- Jaylin Hochstetler
- Posts: 387
- Joined: Sat Mar 13, 2021 8:47 pm
- Location: Michigan
- x 380
- x 355
- Contact:
Re: What actually slows down a project?
I wish I could like that post multiple times.jcapriotti wrote: ↑Mon Feb 07, 2022 3:24 pm In my experience:
......now back to year 5 of trying to get this global PLM system implemented.
- Setting unrealistic deadlines without input from those doing the work.
- Ignoring those users when they do ask.
- Undoing those decision once they realize it isn't going to work.
It is very true.
Makes me think of... Edit to add: I was kinda surprised when I saw that meme in a SolidEdge blog: https://blogs.sw.siemens.com/solidedge/ ... figurator/
A goal is only a wish until backed by a plan.
Re: What actually slows down a project?
Interruptions by anything, or person.... Stopping a train of thought and restarting again kills productivity.
- zxys001
- Posts: 1077
- Joined: Fri Apr 02, 2021 10:08 am
- Location: Scotts Valley, Ca.
- x 2305
- x 998
- Contact:
Re: What actually slows down a project?
Coffee Breaks!HerrTick wrote: ↑Mon Feb 07, 2022 2:19 pm I the past (and, almost certainly, the future), I spoke derisively about users who try way too hard to minimize mouse-clicks and feature count. While these things measure CAD gamesmanship, these things are never what accelerates a project.
CAD acumen is not tested by what you can make, but what you can change. Can your CAD models stand up to the twists and turns of unforeseen changes that inevitably crop up on the path from drunken marketing feverdream to final delivery?
"Democracies aren't overthrown; they're given away." -George Lucas
“We only protect what we love, we only love what we understand, and we only understand what we are taught.” - Jacques Cousteau
“We only protect what we love, we only love what we understand, and we only understand what we are taught.” - Jacques Cousteau
-
- Posts: 221
- Joined: Tue Mar 09, 2021 7:25 am
- Location: Netherlands
- x 184
- x 229
Re: What actually slows down a project?
Superfast SolidWorks operators, creating SolidWorks files in huge numbers in less time. After that, small errors are included in the files, there is no way to change/reuse these files, all parts are made with surfaces, way to complex features and over weighted. And all these files have to be re-created.
Re: What actually slows down a project?
[sarcasm]
[/sarcasm]-
I may not have gone where I intended to go, but I think I have ended up where I needed to be. -Douglas Adams
I may not have gone where I intended to go, but I think I have ended up where I needed to be. -Douglas Adams
Re: What actually slows down a project?
Biggest slow down is hurrying up.
- Glenn Schroeder
- Posts: 1522
- Joined: Mon Mar 08, 2021 11:43 am
- Location: southeast Texas
- x 1759
- x 2132
Re: What actually slows down a project?
Useless meetings.
"On the days when I keep my gratitude higher than my expectations, well, I have really good days."
Ray Wylie Hubbard in his song "Mother Blues"
Ray Wylie Hubbard in his song "Mother Blues"
Re: What actually slows down a project?
This.Frank_Oostendorp wrote: ↑Tue Feb 08, 2022 6:45 am Superfast SolidWorks operators, creating SolidWorks files in huge numbers in less time. After that, small errors are included in the files, there is no way to change/reuse these files, all parts are made with surfaces, way to complex features and over weighted. And all these files have to be re-created.
- jcapriotti
- Posts: 1869
- Joined: Wed Mar 10, 2021 6:39 pm
- Location: The south
- x 1214
- x 1999
- DanPihlaja
- Posts: 849
- Joined: Thu Mar 11, 2021 9:33 am
- Location: Traverse City, MI
- x 812
- x 980
Re: What actually slows down a project?
Ahh, the ol' pre-meeting meeting. Yes....takes me back...
-Dan Pihlaja
Solidworks 2022 SP4
2 Corinthians 13:14
Solidworks 2022 SP4
2 Corinthians 13:14
Re: What actually slows down a project?
From a mold designer " Here's my widget, go ahead and get started on the mold, I'm not done with the part design yet but I don't think too much will change".
- the_h4mmer
- Posts: 136
- Joined: Mon Jan 31, 2022 6:49 am
- x 106
- x 80
Re: What actually slows down a project?
- One person carrying the responsibility of 3 full time roles: design engineer, PDM/CAD admin, and 3D printing lead (I'm the only engineer)
- Information bottle necks (or just no information)
- Priorities shifting faster than the wind changes directions
- Chasing shiny ideas for development projects
- A broken PDM library (tons of out-of-context/broken references, out-of-band changes, assemblies released with unreleased parts, terrible check-in practices, little to no notes, etc.)
- this all was done before I arrived at my current organization, and now I've inherited the mess, and no one wants to commit to the time needed to fix this, because Sales can't stop selling
Me (8 months ago): hey, this is going to be a problem, but I have a plan on what we need to do to fix it
{no one cares}
Sales (2 weeks ago): THIS IS A PROBLEM WE MUST FIX IMMEDIATELY
{now everyone cares, but only enough to figure out convoluted work arounds to have 'sales ready' drawings}
- Too many projects (what's normal here, is 5-6 projects for a single, early career engineer normal?)
- "I need you to update this drawing/design quick, should only take 20 minutes right?"
- Designs without constraints or dimensions and no information (if it exists, no clue where it is) documenting the design
Re: What actually slows down a project?
Recently been getting a barrage of emails from a certain CAD vendor telling me their software will make projects go faster.
No, honey, It won't.
No, honey, It won't.
Re: What actually slows down a project?
Another project timeline killer--adding or losing people.
Adding people can be worse than losing people.
Manager: "How far behind are we?"
Engineer: "Six weeks."
Manager: "What if we add two more people to the team?"
Engineer: "Sixteen weeks!"
Adding people can be worse than losing people.
Manager: "How far behind are we?"
Engineer: "Six weeks."
Manager: "What if we add two more people to the team?"
Engineer: "Sixteen weeks!"
Re: What actually slows down a project?
I've repeatedly told the higher ups here that it would be more cost effective to pay people to sit on their hands for 6 months if we have a slow down. Laying off/letting go people who know what they are doing only to hire people who don't six months later is madness.
- the_h4mmer
- Posts: 136
- Joined: Mon Jan 31, 2022 6:49 am
- x 106
- x 80
Re: What actually slows down a project?
Although I do agree, especially in the context @JSculley brings up, but presently I'm desperate for someone else to join the team. I know it's going to be rough early on, but I need to have someone I can pass off some design work to while I try to repair the PDM vault (all of it).